Qase | Test management platform logo
Qase | Test management platform
Create
Roadmap
Feedback
Qase Roadmap
2

    Boards

  • Qase Roadmap

  • Feature Requests

  • Integrations

  • Bugs

  • Questions

Powered by Canny

Qase Roadmap

Main roadmap board managed by Qase team.
posts
Parameterized shared steps
Shared steps are very useful and i propose will be a lot more if we could parameterize them. For a piece of data thats required in the shared step can be named as a variable/parameter which can be specified a value either in the test case or during test run time. This will make the shared steps way more reusable and us QA Engineers a lot more productive.
11
·

planned

Shared Steps for multiple projects
It would be great to have an option to use shared steps not in just one project, but choose multiple projects to use it in.
2
Powered by Canny