Add Test Plan or Run option: Stick with original test cases
planned
Ilya Volkov
planned
This post was marked as
declined
Ilya Volkov
planned
Ilya Volkov
under review
T
Tom Nakase
Here's a steps to reproduce the issue I have.
Pre Condition:
Create a test cases and test plan.
Step:
- Create and start test run A
- Finish test run A
- Edit or add steps of test case in test repository
- Check test run A
Result:
Test run A has updated test case which was not used during the run.
Expected:
Test run A should have original (unedited) test case.