Qase | Test management platform logo
Qase | Test management platform
Create
Roadmap
Feedback
Qase Roadmap
5

    Boards

  • Qase Roadmap

  • Feature Requests

  • Integrations

  • Bugs

  • Questions

Powered by Canny

Qase Roadmap

Main roadmap board managed by Qase team.
posts
Parameterized shared steps
Shared steps are very useful and i propose will be a lot more if we could parameterize them. For a piece of data thats required in the shared step can be named as a variable/parameter which can be specified a value either in the test case or during test run time. This will make the shared steps way more reusable and us QA Engineers a lot more productive.
11
·

planned

Powered by Canny